Guided product demo

See Glewit Build a Real Proposal

Pick a project below. We’ll build the proposal — you make one choice — see the finished document in under a minute.

New Gunite Pool — example project

New Gunite Pool

$95K – $110K

Custom 16×32 gunite pool with bluestone patio, Hayward variable-speed pump, ColorLogic LED lighting, and H-Series heater. Pick a finish, generate the proposal.

Hayward TriStar VS pump · ColorLogic lighting · H-Series heater
Try this scenario →
Pool Renovation — example project

Pool Renovation

$45K – $60K

Resurfacing an existing 18×36 pool with new Hayward pump and optional salt system. Pick the scope of work, generate the proposal.

Hayward TriStar VS · AquaRite salt system · OmniX automation
Try this scenario →
Luxury Custom Build — example project

Luxury Custom Build

$180K – $250K

Custom 20×40 pool with attached spa, premium Hayward TriStar VS 900 pump, ColorLogic LED package. Pick your options, generate the proposal.

Hayward TriStar VS 900 · OmniLogic automation · ColorLogic package
Try this scenario →
Paver Patio Package — example project

Paver Patio Package

$18K – $32K

Techo-Bloc paver patio with stone seating wall, French drain, and lawn restoration. Pick a patio size, generate the proposal.

Techo-Bloc pavers · stone seating wall · French drain
Try this scenario →
Residential OWTS Install — example project

Residential OWTS Install

$22K – $32K

New residential OWTS install with Infiltrator drain field, DEM permit coordination, and final inspection. Pick tank+pump config, generate the proposal.

Infiltrator chambers · 1,000 / 1,500 gal tank · DEM permit + Class IV designer coordination
Try this scenario →
Commercial Solar + Battery Storage Package — example project

Commercial Solar + Battery Storage Package

$75K – $340K

Rooftop solar array with battery backup for a small commercial building. Pick the system size and battery capacity, generate the proposal with engineered single-line diagrams and utility-interconnect paperwork.

Tesla Powerwall · Enphase microinverters · Square D service equipment
Try this scenario →
Hazard Oak Removal — example project

Hazard Oak Removal

$3K – $9K

Failing oak removed safely from over the house, stump ground flush. Choose the access approach for your situation.

ISA-certified climbing · Bandit chipper · Vermeer stump grinder
Try this scenario →
Central Heat Pump Replacement (Variable-Speed) — example project

Central Heat Pump Replacement (Variable-Speed)

$15K – $23K

Right-sized by Manual J, installed to spec, commissioned in writing. Same 3-ton load — choose the efficiency and cold-climate tier that fits.

Carrier Infinity variable-speed · Manual J-sized · commissioned to spec
Try this scenario →
Tear-Off & Re-Roof — Architectural Shingle System — example project

Tear-Off & Re-Roof — Architectural Shingle System

$18.5K – $42.5K

Full tear-off, complete manufacturer-certified system, warranty registered at handover. Same roof — choose the manufacturer system and warranty tier that fits.

GAF Master Elite · Owens Corning Platinum · CertainTeed SELECT · system-warranty registered
Try this scenario →
Whole-Home Backup System — Premium Solar + Battery — example project

Whole-Home Backup System — Premium Solar + Battery

$72K – $135K

Engineered PV + battery backup, carried through utility Permission To Operate. Same home — choose the array size, module tier, and battery configuration that fits.

Q.CELLS / REC / Maxeon · Enphase IQ8 microinverters · Enphase + Tesla storage · carried through PTO
Try this scenario →
Custom Kitchen & Master Bath Remodel — example project

Custom Kitchen & Master Bath Remodel

$175K – $475K

Premium kitchen and master bath remodel with Wood-Mode cabinetry, Sub-Zero appliances, and stone surfaces. Same home — choose the rooms in scope, the cabinetry line, and the appliance suite.

Wood-Mode / Poliform cabinetry · Sub-Zero & Wolf / Gaggenau · Taj Mahal & Cambria surfaces · Waterworks / Dornbracht · allowances carried in the total (§15)
Try this scenario →
Frozen Pipe Burst — Full Mitigation & Reconstruction — example project

Frozen Pipe Burst — Full Mitigation & Reconstruction

$95K – $325K

Frozen-pipe burst carried from emergency response through reconstruction to pre-loss condition. Same loss — choose the floors affected, the finish grade, and whether owner-elected upgrades are in scope.

Phoenix / Dri-Eaz drying · IICRC S500 mitigation · Xactimate-aligned scope · reconstruction to pre-loss (§15) · Owner-Elected Upgrades direct-pay
Try this scenario →
Custom Outdoor Living Package — Deck, Pergola & Kitchen — example project

Custom Outdoor Living Package — Deck, Pergola & Kitchen

$95K – $325K

Custom outdoor room with deck, pergola, and outdoor kitchen — built as one multi-trade project. Same property — choose the square footage, the decking grade, the shade structure, and whether the kitchen is in scope.

TimberTech AZEK Vintage · Feeney CableRail · StruXure / Renson motorized shade · Kalamazoo + True outdoor kitchen · Lutron + Sonance · PE-stamped structures · sold as packages (§15)
Try this scenario →
Premium Window & Door Replacement — Marvin Architectural, Folding Glass Walls & Custom Hardware — example project

Premium Window & Door Replacement — Marvin Architectural, Folding Glass Walls & Custom Hardware

$85K – $295K

Premium whole-home window and door replacement with Marvin Architectural and folding glass walls, priced per opening. Same home — choose the product tier, the opening count, and whether folding glass or historic scope is included.

Marvin Signature Ultimate / Architectural · Andersen E-Series · Loewen all-wood · LaCantina / NanaWall folding glass · Emtek + Rocky Mountain Hardware · AAMA InstallationMasters · priced per opening (§15)
Try this scenario →
Premium Custom Home Build — Architect-Led Coastal Residence — example project

Premium Custom Home Build — Architect-Led Coastal Residence

$1M – $1.5M

Architect-led custom home run from one document — GC milestones for the build, allowances for the selections. Same home — choose the spec tier, the square footage, and whether a high-performance overlay is in scope.

Architect-led · billed by milestone · sibling-trade allowances · ENERGY STAR / Passive House overlays · one document (§15)
Try this scenario →

These scenarios use sample data. Nothing you do here is saved. Want to start your own? Create a free account →